Subscribe

RSS Feed (xml)

Powered By

Skin Design:
Free Blogger Skins

Powered by Blogger

Tuesday, May 5, 2009

Material Master Unit of Measure

Is there a way to enable users to change unit of measure on a material when doing GR, GI and placing an order?

Scenario: Buying goods in a box, and issuing in packets or each

Where can I make these changes?

By: Thabo

The only change that will affect your UOM is when you place an order.(GR/GI will consider what has been captured when an order is placed). Bear in mind that the UOM is dependent on the type of Order that you are placing.

Internal Order will always check for Base Unit of Measure, whereas, External Order will do the conversion if you use Preq.

If you place External Order directly on ME21N, the system will automatically pull through your Order Unit.

Hope this will make sense. ( All this changes can be done on MM01 / MM02 )

Material Master Unit of Measure Screen

Purchasing View.

UOM of Purchasing View

Plant Data View.

Plant View of UOM




Related Topics:
Difference Between Client , Purchasing Org , Plant , Company code
Maintain relation between Alternatives Materials
Maintain the user default settings when creating Material Master
SAP Inventory - Allow Negative stocks
MM - Controlling the Fields in Material Master
MM - Control the Output Format of your Material Numbers
MM - Define whether the Material can be used at which business process
MM - Control the Number Range Intervals for Material Master
One Storage Location for Two Different Plant
Delete storage location in material master
Displaying Material Flag of Deletion
Block or Delete Any Material From Material Master
Creation of same Material Code in Different Company Codes
Price Control V or S in material type
Changing the Material Valuation Types
Change Base Unit of Measure
Material Master Unit of Measure
Mass Change Material Group In Materials Master
SAP Batch Handling
Config Setting In Batch Management
MM Configuration Tips
Safety Stock Calculation in SAP
Procedures for copying One Plant to Another
Adding Views in Material Master
SAP Split Valuation for Materials
Specifying Split Valuation by creating Material Subject to Split Valuation
Changing The Valuation Class
Archiving the Material Master
Bookmark and Share

No comments:

Post a Comment

Archives