In order to assign multiple planned order to a single purchase requisition number, you need to make used of the external purchase requisition number range.
Define your external purchase requisition number range in OMDN.
Assign the external purchase requisition group number range to used in OMI3.
Once the IMG settings are completed, you can used MD15 to assign the multiple planned order into a single purchase requisition number.
In MD15, select the planned order you want to convert to a purchase requisition.
Next, click the Convert Online button.
SAP will display the planned order in change mode.
Now, look for the Purchase Requisition fields and supply the Purchase requisition number.
For example, assuming that you assign the external number range 2000001.
In the planned order, you type the first number range 2000001 and item number 10 subsequently, copy and paste the number range but input the item number manually.
It would be like 2000001 10 and save
2000001 20 and save.....
The disadvantages is that the user have to track and enter the external number range manually.
Therefore, there is a trade off, between
1. having a single planned order for a single purchase requisition number or
2. having multiple planned order to a single purchase requisition number.
Friday, October 9, 2009
Subscribe to:
Post Comments (Atom)
Archives
-
▼
2009
(414)
-
▼
October
(16)
- Production Order Production Setup Time
- Production Order Material Stock in Production Orde...
- Production Order Automatic Conversion to Productio...
- Production Order Regarding Production Order Confir...
- Production Order What is Backflushing?
- Production Order How Costing takes place in Produc...
- Production Order SAP flow for REWORK activity
- Production Order Serial Number For Component
- How To Delete Old PP Production Orders
- SAP PP How to “permanently” delete new planned ord...
- SAP PP Planned Order Assign Multiple Planned Order...
- SAP PP Planned Order Conversion to Process Orders
- PP MRP Why used Planning tools like APO or I2?
- PP MRP Difference between MRP vs MPS
- SAP PP MRP Factory Calendar
- PP MRP GR processing time in PP and MM
-
►
September
(36)
- PP MRP Calculation to determine the delivery date ...
- PP MRP Purchasing processing Time - OPPQ
- PP MRP Define Safety Stock Availability
- PP MRP Questions on MRP Group and MRP Controller
- PP MRP Planning separately via Storage Location or...
- PP - The Common Planning Strategy used
- PP MRP Why Planning file entry still Exists?
- PP MRP Planning Strategy Selection
- PP MRP Monthly lot size
- PP MRP Reservation Not Created During MRP Run
- PP MRP How to Configure Range Of Coverage Profile
- PP MRP Lose of link between sales order and produc...
- PP Batch Characteristics while Running MRP
- PP What is Firming Type in the MRP Types
- PP MRP Functions of Production Version
- PP MRP What is Discrete Manufacturing, REM and Dem...
- PP MRP Discrete Manufacturing - The Made To Order ...
- PP MRP Discrete Manufacturing - The Made To Stock ...
- PP MRP Discrete Manufacturing - The Step By Step T...
- PP MRP Steps To Do Repetative Manufacturing
- PP Message / System Status Changing warning msgs t...
- Production Planning - Production Control System Me...
- PP Message / System Status Production Order System...
- Explain System and User Status In Production Order...
- SAP PP Certification Sample Questions I
- SAP PP Self Test Certification Questions
- SAP PP Questions and Answers II
- Sample Questions on SAP PP
- SAP PP Test Questions MCQ
- Interview Questions and Anwsers on SAP PP
- PP Interview Questions Year End To Do List
- SAP Production Planning and Control Frequently Ask...
- List of PP Transport Request and their IMG Path
- The Overall Flow For SAP PP
-
▼
October
(16)











0 comments:
Post a Comment