All the material may not be important for cyclic count purpose, it may be required to count
some items frequently and some items rarely.
A cyclic count indicator A or B or C or D is allocated to material in the material master
based on either consumption value (consumption X rate) or forecast value
(forecast quantity X rate).
The item with more consumption value are classified as A, and with minimum as D.
“A” indicator items will be counted frequently (say every month), D will be less frequently
(say every 6 months or every one year). Daily a number of items will be taken for count, some
may be with A indicator, some with B and so on.
Mark all materials that are to be included in cycle counting with a cycle counting indicator
in the material master record (storage data). The cycle counting indicator is used to group
the materials together into various cycle counting categories (for example, A, B, C, and D).
There is an option in SAP to have a fixed indicator for a material say A for a material which
does not have a high consumption value but it is important to count it every month, then the
material can be marked as A indicator in material master with indicator “fixed”
In Customizing OMCO, for Inventory Management, you can define for each category the time
intervals at which the materials are to be counted.
Fields : No. of phys. inventories per fiscal year for cycle counting
For e.g. A - 12, B - 6, C - 3, D - 1
Specifies how often during the fiscal year a physical inventory is to be carried out for a
material subject to cycle counting.
The system uses this specification to convert the count interval into workdays.
Fields : Physical inventory interval (in workdays) for cycle counting
For e.g. A = 12 times per year and your Total Factory Calendar days = 300
The interval will be calculated as 300 / 12 = 25 days
Specifies after how many workdays following the last inventory count another physical
inventory has to be carried out for a given material.
The count interval is determined automatically on the basis of the number of physical
inventories specified for the fiscal year.
Fields : Float time (in workdays) for cycle counting
For e.g. A - 10, B - 20, C - 30, D - 0
Indicates the number of workdays by which the planned count date may vary from the current
date.
For examples :-
For the plant, the float time is five days.
A physical inventory has been planned for a material belonging to category C for June, 1.
On expiration of the float time (after June, 6), the physical inventory has not yet been
carried out.
Irrespective of the category, the material is parked for the next cycle counting run.
Fields :- Percentage of performance measure for cycle counting ind.
Specifies the percentage allocation of the materials to the individual cycle counting
categories.
The percentage value is used for automatic assignment of the cycle counting indicator.
For example :-
In the given plant, 200 materials are subject to the cycle counting physical inventory
procedure.
In Customizing for Inventory Management, the following percentage allocation has been defined
for the plant:
A materials: 50%
B materials: 25%
C materials: 15%
D materials: 10%
----
100%
----
In the cycle counting analysis, the materials are sorted by consumption. After completion
of the analysis, the cycle counting indicator is assigned as follows:
The first 3 materials (sorted in descending order according to consumption) represent 50% of
the consumption and have the indicator A.
The next 12 materials represent 25% of the consumption and have the indicator B.
The next 49 materials represent 15% of the consumption and have the indicator C.
The remaining 136 materials represent the rest (10%) of the consumption and have the
indicator D.
You can use the program ABC Cycle Counting Analysis (MIBC - RMCBIN00) to perform an analysis.
In this analysis, the system assigns the materials to the individual categories according to
consumption or requirements (forecasts).
You can also specify whether this analysis is to consider only the materials with cycle
counting indicator or all materials. The cycle counting indicator in the material master
records can be updated automatically by this program.
Marking Materials for Cycle Counting
This step is only required if you perform cycle counting for the first time or if you want
to update the cycle counting indicators.
In the material master record (storage data), maintain the cycle counting indicator for all
the materials that are to be included in cycle counting.
You can set the indicator in one of the following two ways:
1. manually in the material master record. To do this, choose
Material -> Change from the Material Master menu.
2. automatically using ABC analysis To do this, choose
Special procedures -> Cycle counting -> Set CC indicator from the Physical Invent
Related Topics:
Setting Cross-company transaction
Inventory Beginning Balances
Variances between material and account of stock when you use MB5L
Planned Delivery Time as Workdays
Physical Inventory Item Class
Physical Inventory Process
What is A, B, C and D Indicator for a material for cyclic count?
Valuation Category
MBST: Reversal of cleared items in FI
Difference Between Cancellation and Reversal
Automate the opening of MM periods
Allow/Disallowed Backposting of Inventory Posting
Movement Error - Posting Only Possible Between
Re-Open The Previous Period
Process Of Imported Material With Excise
Difference for Stock Transfer and Transfer Posting
Creating The Stock Transfer Order
Monday, May 4, 2009
Subscribe to:
Post Comments (Atom)
Archives
-
▼
2009
(413)
-
▼
May
(87)
- Difference Between Client , Purchasing Org , Plant...
- Maintain relation between Alternatives Materials
- Maintain the user default settings when creating M...
- SAP Inventory - Allow Negative stocks
- MM - Controlling the Fields in Material Master
- MM - Control the Output Format of your Material Nu...
- MM - Define whether the Material can be used at wh...
- MM - Control the Number Range Intervals for Materi...
- One Storage Location for Two Different Plant
- Delete storage location in material master
- Displaying Material Flag of Deletion
- Block or Delete Any Material From Material Master
- Creation of same Material Code in Different Compan...
- Price Control V or S in material type
- Changing the Material Valuation Types
- Change Base Unit of Measure
- Material Master Unit of Measure
- Mass Change Material Group In Materials Master
- SAP Batch Handling
- Config Setting In Batch Management
- MM Configuration Tips
- Safety Stock Calculation in SAP
- Procedures for copying One Plant to Another
- Adding Views in Material Master
- SAP Split Valuation for Materials
- Specifying Split Valuation by creating Material Su...
- Changing The Valuation Class
- Archiving the Material Master
- Inventory Beginning Balances
- Setting Cross-company transaction
- Physical Inventory Item Class
- Planned Delivery Time as Workdays
- Variances between material and account of stock wh...
- Physical Inventory Process
- MBST: Reversal of cleared items in FI
- Valuation Category
- What is A, B, C and D Indicator for a material for...
- Automate the opening of MM periods
- Difference Between Cancellation and Reversal
- Movement Error - Posting Only Possible Between
- Allow/Disallowed Backposting of Inventory Posting
- Difference for Stock Transfer and Transfer Posting
- Process Of Imported Material With Excise
- Re-Open The Previous Period
- Creating The Stock Transfer Order
- Displaying Commodity Codes and Import Code
- SAP MM Configuration How to do?
- Change Base Unit of Measure using SAP MM
- Mass Change Material Group In Materials Master
- mySAP Certification - Criteria For Application
- MM Process Flow
- SAP MM Certification Sample Questions for Material...
- SAP MM Self Test Questions
- General Test of SAP MM Knowledge
- SAP Material Management MCQ
- My SAP MM Certification Experience
- Meaning of Archiving Residence Time
- Deletion of Vendor Consignment Records
- How to use "me98" to delete PO from system complet...
- Price Control V or S in material type
- Changing the Material Valuation Types MM Archiving
- Deletion of Info Record
- SAP Split Valuation for Materials
- Creation of same Material Code in Different Compan...
- MM - Control the Output Format of your Material Nu...
- Control the Number Range Intervals for Material Ma...
- One Storage Location for Two Different Plant MM Ar...
- Maintain the user default settings when creating M...
- MM - Controlling the Fields in Material Master
- SAP MM Difference between Client , Purchasing Org ...
- SAP MM Inventory - Allow Negative stocks
- SAP MM Consignment
- SAP Solution Manager
- SAP MM Basic Functions
- Conventional Versus Logistic Invoice Verification
- SAP MM - Consignment Process - Settlement
- No tax information during consignment Settlement
- Important Accounts for Invoice Verification
- Use of Invoice Plan in SAP
- List of standard Reports in MM
- SAP LIS - Wrong figures in Logistics Information S...
- List of RA caculated values
- Project Status set to TECO
- What is WBS element?
- Stop Commitments Before Release Of Projects
- Aggregate POC Calculation
- Dynamic Selection on Report Not Working
-
▼
May
(87)
No comments:
Post a Comment