You define the default values for BOM in OS28.
- Based quantity
- BOM Status
- Size Unit
- Var-size item unit
You control the Material type allowed for the BOM header in transaction OS24.
In transaction OS27, you define the central settings for your BOM management system. This
are one-time settings for BOM management, which should not be change after production.
Low date
When you create or process BOMs, the default date is the date defined in your system as the
earliest processing date (01/01/1900 in the standard system).
BOM validity maintenance
Tick if want the user to specify a valid-from date when maintaining BOMs. If not tick the BOM
created as of the current date or the system low date (1/1/1990).
EC management active
Tick if you want to make historical changes to BOMs with reference to a change number.
(This means that the status of the BOM both before and after the change is stored in
the system.) In this step, you only specify whether engineering change management can be
used for maintaining bills of material. In transaction OS25, Configure history requirement
for BOMs, you define whether you want to make the use of engineering change management a
requirement in certain cases.
Hist. reqmt variant
Use this indicator to control when history requirement applies to new variants or
alternatives in a BOM group.
Sub-item documentn
You use the Sub-item documentation indicator to define whether changes to sub-items are
documented.
Header
Create BOM header with parameter validity
TECHINCAL TYPE
Mult. BOM inactive
Tick if no multiple BOMs can be maintained in this R/3 system.
Variant BOM inactive
Tick if no variant BOMs can be maintained in this R/3 system
BILL OF MATERIAL ITEM
BOM item explosion type
If you create a BOM item with reference to a change number and change the valid-from date
(in the change header or alternative date), then this can change the sequence of validity
periods of a BOM item. The indicator BOM item explosion type specifies whether and according to what rules,
the system determines a unique change status, when you display, evaluate or change a BOM to
a date in the overlap period.
Description variable-sized item
This indicator controls which text is displayed in BOM processing for a variable-sized item.
Repeated effectivity via external item ID
This indicator ensures that an item that already exists under an external item ID can be used.
General settings
Unit 'piece'
In the standard system, this field contains a unit of measure for "piece". You can change
this unit. This unit is the base unit of measure (BOM header) or the component unit of
measure.
Base unit of measure for:
Equipment BOM
Functional location BOM
Document structure
Standard BOM
Component unit of measure for:
Text item
Document item
Non-stock item without material master record
CAD active
If you want to maintain BOMs from a CAD system, set this indicator. This activates an
additional field in the BOM header and BOM item, which tells you whether the BOM header or
BOM item was maintained from a CAD system.
If you deactivate engineering change management, changes to bills of material are not
recorded.
The modification parameters defined here apply to all BOM categories.
The following settings are made in the standard R/3 System:
1. Validity date maintenance and engineering change management are active.
2. The current system date is the default valid-from date.
3. CAD is active.
4. Explosion type for BOM item: blank.
Thursday, July 23, 2009
Subscribe to:
Post Comments (Atom)
Archives
-
▼
2009
(413)
-
▼
July
(138)
- SAP PP - Define the default components reservation...
- PP Goods Receipt (101) for Process Order
- SAP PP Goods receipt and goods issue through a PI ...
- SAP PP Goods Movement Steps for Subcontracting
- SAP PP Goods Movement Stock in Transit - liquidati...
- Restricting Good Receipt Unless Production Order C...
- SAP BOM How to link BOM component to storage locat...
- When is a Material BOM Not Exploded?
- Simple BOM & Group BOM
- Explode SAP PP BOM
- Where used list for SAP PP BOM
- SAP PP - Controlling data for your Bill of Materials
- Allocating PP BOM to Other Plant
- SAP PP BOM Mass Change Bill of Materials
- Multi-level configuration with variants PP BOM
- SAP PP BOM What exactly is a Phantom item or Assem...
- Attachment Of Drawings in PP BOMs
- Variant Configuration for an Order
- SAP BOM components never explode
- Checking Costs and Revenues from the Sales Order
- Production Planning - Extract data from MRP Table
- ABAP Reports Production Order Quantity Change Dail...
- SAP PP ABAP Reports Compare Production Confirmatio...
- ABAP Reports Customized Work Center List PP
- Tcodes used for SAP Plant Maintenance
- SAP TCode for SAP ArchiveLink: Link check
- Transparent Table Relate With PM Module
- Effective SAP PM Implementation SAP
- Deadline Monitoring for Maintenance Plans
- Scheduling function in SAP
- Definition and Formula for PM terms SAP
- SAP Plant Maintenance Assembly
- SAP Track New Plant Machine Installed at Customer ...
- Questions Answers on Functional Locations SAP PM
- SAP Questions Answers on PM Equipment
- SAP PM Measuring Points Questions
- Plant Maintenance Q & A - Rept & Analyses - Mgt of...
- SAP PM Maintenance Planning Questions and Answers
- SAP PM Support Problem Solution
- Maintenance of FT Data in Purchasing Documents
- Control the SAP PM Order Type
- Maintenance Notifications Order Link
- Work Order Cost Control SAP
- Impact on Business if PM Order Not Settled
- SAP In PM how to Return Material Backflushed
- Change Maintenance Strategy in General Task List
- User Status Set Date in Maintenance order
- SAP to best handle Repeat Maintenance Jobs
- Recording Measuring Docs. Against Work Orders
- Stop Complete Confirmation (IW41) before (IW32)
- Difference Between TECO & Business Completion
- SAP Settlement Rule In Maintenance Order
- Integration Between PM, QM and PP
- PM Integration With Other Modules
- Control Maintenance Budget in SAP PM
- Before customizing the Master Data in SAP Plant Ma...
- SAP PM - Material Master Vs. Equipment Master
- SAP PM Equipment FAQ
- Show Equipments Characteristics in a List
- Component Allocation in Task List
- Scenario of Rotating Equipment
- Attach a Drawing To Equipment Master Data
- Plant Maintenance Reservations
- SAP Deletion and control of materials Reservations...
- SAP PM - SM notifications
- PM (Service Management) Geographical Work Centres
- SM Revenue and Non Revenue Combination Orders
- Open and Close Posting FICO Periods
- SAP SD Output/Email Sending a billing document by ...
- SAP Output/Email SAP SD Customizing Picking Output
- SAP SD Output/Email Program for Sales Order by Cus...
- Purchase Order and Sales Order Workflow
- Workflow of Purchase Requisition Release Strategy
- Changing Vendor on Purchase Order
- One Time Vendors SAP MM
- Vendor Evaluation for Purchasing
- Process of Subcontract in SAP MM
- Subcontracting - Key Points
- Procedure for Setting Partner Functions
- What Is Outline and Scheduling Agreement
- What is Vendor Consignment?
- Multiple Currency Quotation or Invoice From Vendor
- User Exits In MM Area
- IMG MM Transaction Codes Organizational Structures
- SAP MM Transaction codes
- SAP TCode for Personal Menu Volker Hofmann
- SAP Transaction Code for: Waive Acceptance Order T...
- SAP Transaction Code for: New Monthly Returns Repo...
- SAP MM Important Tcodes 2
- IMG Change Logs and can ACCT Tables be Deleted
- Common Tables used by SAP MM
- SAP MM All The Tables In SAP MM Purchasing
- SAP MM Tables - click to enlarge
- Interview Questions on SAP MM
- SAP Material Management Interview Questions
- SAP MM Support Problem Solution
- Common SAP MM Questions I
- SAP MM Material Management Frequently Asked Question
- What Is The DataFlow Of MM?
- SAP MM User Exit That Is Applied In MM Area
-
▼
July
(138)
No comments:
Post a Comment