1) Define Distribution Keys
IMG > Production Planning for Process Industries > Master Data > Material List > Item Data > Item Data from related areas > Define Distribution Keys
2) Determine Person responsible for Resource –
IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Determine Person responsible
3Define Planner Group-
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Define Capacity Planner
4) Define Capacity Planner –
IMG > Production Planning for Process Industries > Master Data > Resource > Capacity Requirement Planning > Determine Capacity Planner
5) Determine Standard Value Parameter –
IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Standard Value > Define Parameter
6) Define Setup Groups and Setup Group Categories
Define set up groups and set up categories –
IMG > Production Planning for Process Industries > Master Data > Master Recipe > Data for operations and phases > Define set up groups and set up group categories
7) Define copy setting between plants-Process
IMG > Production Planning for Process Industries > Process Management > Tools > Define copy setting between plants
8) Define Set Up Control Recipe destination –
IMG > Production Planning for Process Industries > Process Management > Control Recipe/PI sheet > Set up control recipe destination
9Define MRP controller –
IMG > Material Management > Consumption based Planning > Master Data > Define MRP controller
10) Special Procurement –
IMG > Material Management > Consumption based Planning > Master Data > Define Special procurement types
11) Define Floats (Scheduled Margin Key)-
IMG > Material Management > Consumption based Planning > Planning > Define Floats (Scheduled Margin Key)
12Define Splitting of Forecast requirements for MRP-
IMG > Material Management > Consumption based Planning > Evaluation > Forecast > Define Splittng of forecast requirements of MRP
13) Maintain Correction Factors for Forecast
IMG > Material Management > Consumption based Planning > Planning > Procurement > Maintain Correction factors for forecast
14 Carry Out Overall Maintenance of Plant Parameters
Maintaining plant parameters in MRP –
IMG > Material Management > Consumption based Planning > Plant Parameters > Carry out overall maintenance of plant parameters
15) Define Planning Horizon
Define Planning Horizon –
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define Planning Horizon
16) Activate Requirement Planning –
IMG > Material Management > Consumption based Planning > Planning > Activate Requirement Planning
17) Define Range of Coverage Profiles (Dynamic Safety Stock)
Range of coverage profile –
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define range of coverage profile (Dynamic Safety Stock)
18) Define Stock in Transfer and Blocked Stock Availability
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define Stock in transfer and blocked stock
19) Define MRP Areas
IMG > Material Management > Consumption based Planning > Master Data > MRP areas > Define MRP areas
20) Carry out maintenance of MRP groups
IMG > Material Management > Consumption based Planning > MRP groups> Carry out maintenance of MRP groups
21) Define Scope of total Planning - MRP
IMG > Material Management > Consumption based Planning > Planning > Define Scope of total Planning
22 Define Order Types
Define Order Type-
IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type
23Define Order Type Dependent parameters –
IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type Dependent parameters
24) Define Production Scheduler –
IMG > Production Planning for Process Industries > Process Order > Master Data > Bill of Material > Define Production Scheduler
25 Define Checking Control - Process Order
Define Availability Check – Define Checking Control –
IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define Checking Control
26) Define Checking Rule for backorder processing –
IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define Checking rule for back order processing
27Define Stock and batch determination for good movement –
IMG > Production Planning for Process Industries > Process Order > Operations > Define Stock and batch determination for good movement
28) Specify Scheduling Parameters
Specify Scheduling Parameters –
IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Specify Scheduling Parameters
29) Define Reduction Strategies
Define Reduction Strategy –
IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Resource data > Define Reduction Strategy
30) Define Confirmation Parameters
Define Order Confirmation –
IMG > Production Planning for Process Industries > Process Order > Operations >
Confirmation > Define Confirmation Parameters
31) Define Valuation of Goods Received
Define valuation of goods receive –
IMG > Production Planning for Process Industries > Process Order > Integration > Define Valuation of goods received
32) MRP creation indicator –
IMG > Material Management > Consumption based Planning > Planning > Define creation indicator
33) Define safety stock –
IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define Safety Stocks
34) Define alternative determination of Production –
IMG > Production Planning for Process Industries > Process Order > Operations > BOM selection > Define alternate determination of production
35) Define no. ranges –
IMG > Production Planning for Process Industries > Process Order > Master data > Order > Number Ranges > Define number ranges for orders
Monday, September 7, 2009
Subscribe to:
Post Comments (Atom)
Archives
-
▼
2009
(413)
-
▼
September
(36)
- PP MRP Calculation to determine the delivery date ...
- PP MRP Purchasing processing Time - OPPQ
- PP MRP Define Safety Stock Availability
- PP MRP Questions on MRP Group and MRP Controller
- PP MRP Planning separately via Storage Location or...
- PP - The Common Planning Strategy used
- PP MRP Why Planning file entry still Exists?
- PP MRP Planning Strategy Selection
- PP MRP Monthly lot size
- PP MRP Reservation Not Created During MRP Run
- PP MRP How to Configure Range Of Coverage Profile
- PP MRP Lose of link between sales order and produc...
- PP Batch Characteristics while Running MRP
- PP What is Firming Type in the MRP Types
- PP MRP Functions of Production Version
- PP MRP What is Discrete Manufacturing, REM and Dem...
- PP MRP Discrete Manufacturing - The Made To Order ...
- PP MRP Discrete Manufacturing - The Made To Stock ...
- PP MRP Discrete Manufacturing - The Step By Step T...
- PP MRP Steps To Do Repetative Manufacturing
- PP Message / System Status Changing warning msgs t...
- Production Planning - Production Control System Me...
- PP Message / System Status Production Order System...
- Explain System and User Status In Production Order
- SAP PP Certification Sample Questions I
- SAP PP Self Test Certification Questions
- SAP PP Questions and Answers II
- Sample Questions on SAP PP
- SAP PP Test Questions MCQ
- Interview Questions and Anwsers on SAP PP
- PP Interview Questions Year End To Do List
- SAP Production Planning and Control Frequently Ask...
- List of PP Transport Request and their IMG Path